PVC Plastic Water Supply and Waste Water Drainage Pipe Extrusion Machine Line

Product Details
Customization: Available
Product Type: PVC Pipe
Screw No.: Double-screw
Still deciding? Get samples of US$ 1/Piece
Request Sample
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
3000000 RMB
Plant Area
501~1000 square meters
  • PVC Plastic Water Supply and Waste Water Drainage Pipe Extrusion Machine Line
  • PVC Plastic Water Supply and Waste Water Drainage Pipe Extrusion Machine Line
  • PVC Plastic Water Supply and Waste Water Drainage Pipe Extrusion Machine Line
  • PVC Plastic Water Supply and Waste Water Drainage Pipe Extrusion Machine Line
  • PVC Plastic Water Supply and Waste Water Drainage Pipe Extrusion Machine Line
  • PVC Plastic Water Supply and Waste Water Drainage Pipe Extrusion Machine Line
Find Similar Products

Basic Info.

Model NO.
50-160mm
Computerized
Computerized
Certification
CE
Customized
Customized
Condition
New
Machine Color
Customized
Extruder Size
65/132
Extruder Motor
37kw Siemens Motor
Temperature Control
Auto Control, Omron Brand
Inverter
ABB Brand
Transport Package
Film Packing
Specification
50-200mm
Trademark
Tongsan
Origin
China
HS Code
84772090

Product Description

1, PVC pipe making machine for manufacturing PVC water tube

Model

Pipe diameter

Extruder model

Motor power

Extrusion capacity

Pipe Cavity
SJPVCG-63 16-40mm 51/105 22kw 100-110kg/h 2
SJPVCG-110 50-110mm 65/132 37kw 150-180kg/h 1
SJPVCG-160 75-160mm 65/132 37kw 150-180kg/h 1
SJPVCG-250 160-250mm 80/156 75kw 300-350kg/h 1
SJPVCG-400 200-400mm 80/156 75kw 300-350kg/h 1


SJPVCG Series Pipe Extrusion Line can produce PVC/CPVC Pipes.
  1. This PVC Pipe Production Line is consists by conical twin screw extruder-mould-vacuum calibrating tank-water spraying tank-haul off-cutter-stacker
  2. Extruder and Haul Off Machine adopt AC frequency speed regulator.
  3. Mould is processed from SC 45# forged material. Mould inner wall is chromed, surface is smooth.
  4. Haul Off machine could use 2 caterpillar, 4 caterpillar etc according to the pipe diameter and wall thickness
  5. Cutter could use saw cutting and planetary cutting, equipped with meter counter.
  6.  The machine has reliable performance and high production efficiency.
  7. By changing extra mould or extruder, this machine could also produce spiral wall pipe, hollow wall pipe, and foam core layer pipe.


PVC Plastic Water Supply and Waste Water Drainage Pipe Extrusion Machine Line

2, Product Description
The production line adopts unique mold and sizing sleeve design, which can produce PVC solid pipe continuously and stably. PVC pipe has the features of strong corrosion resistance, easy adhesion, low price and hard texture. However, due to PVC-U monomer and additive bleed, it is only suitable for supplying water that the temperature not exceeding 45 ºC. PVC pipe is widely used in water drainage, sewage water, chemicals, heating fluids and coolants, food, ultra-pure liquids, mud, gas, compressed air and vacuun m systems.
PVC Plastic Water Supply and Waste Water Drainage Pipe Extrusion Machine Line

3, Equipment List
No. Equipment list for PVC pipe manufacturing plant Quantity
1 Mixing machine 1 set
2 Auto feeder 2 sets
3 Conical double screw extruder 1 set
4 Die head and sizing mold customized
5 1st  cooling tank 1 set
6 2nd  cooling tank 1 set
7 haul off device 1 set
8 auto cutting machine 1 set
9 Laser printer or ink jet printer 1 set
10 PVC pipe stacker 1 set
11 PVC pipe joint belling machine  1 set
12 Crushing machine 1 set
13 PVC powder milling machine 1 set
14 Air compressor 1 set
15 water chiller 1 set

4, Detailed Images
50-200mm double cavity PVC pipe extrusion line,

Extruder for PVC pipe machine: conical double screw extruder
with auto screw feeder
high quality gearbox
37KW siemens motor,equip with ABB inverter
Auto Omron Temperature control
PVC Plastic Water Supply and Waste Water Drainage Pipe Extrusion Machine Line

die head for 50-200mm PVC pipe making
equip size parts for 50,63,75,90,110,125,140,160,180,200mm diameter

water tank for PVC pipe machine

Quantity: two sets
length of tank: 6 meters/tank
cooling type: vacuum cooling and water cooling

PVC Plastic Water Supply and Waste Water Drainage Pipe Extrusion Machine Line

haul off for PVC pipe machine

Quantity of caterpillar: 2-4 sets of rubber caterpillar
speed control: by ABB inverter control

 


PVC Plastic Water Supply and Waste Water Drainage Pipe Extrusion Machine Line

Auto cutter for PVC pipe machine
equip with dust collection system
cutter type: simple saw cutting, or Planetary cutting .

PVC Plastic Water Supply and Waste Water Drainage Pipe Extrusion Machine Line

Product stacker

auto stacking, 6 meter length

PVC Plastic Water Supply and Waste Water Drainage Pipe Extrusion Machine Line
Online laser printing machine


PVC Plastic Water Supply and Waste Water Drainage Pipe Extrusion Machine Line
FAQ
1, DO YOU PROVIDE OEM SERVICE?
we accept OEM order to design the machine according to customer's special requirements.

2, HOW CAN I GET THE TECHNICAL PARAMETERS?
Please contact us for sending you detailed quotation with technical parameters

3, WHAT IS THE  WARRANTY TERMS?
3.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER'S WAREHOUSE
3.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
3.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.

4, WHAT IS THE DELIVERY CONDITIONS?
4.1 DELIVERY CONDITION: FOB QINGDAO PORT.
4.2 DELIVERY TERM: WITHIN 45 WORKING DAYS AFTER RECEIPT OF  ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
4.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER SHOULD ARRANGE FOR SUPERVISION OF LOADING.

5, WHAT IS THE PAYMENT TERMS?
5.1 INSTALLMENT I: 30% OF TOTAL PAYMENT TO BE PAID AT ADVANCE
5.2 INSTALLMENT II: THE BALANCE 70% OF TOTAL PAYMENT TO BE PAID BY TT OR LC AT SIGHT

6, HOW TO DO THE INSPECTION WORK BEFORE SHIPMENT?
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST  FOR THE MACHINE INSPECTION IN SELLER'S FACTORY. THE BUYER SHOULD COME TO SELLER'S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER'S FACTORY TO DO THE INSPECTION WORK.

7, HOW TO DO THE INSTALLATION AND EQUIPMENT COMMISSIONING?
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER'S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE, AND THE BUYER SHOULD UNDERTAKE THE WHOLE FOOD/PLACE AND ROUND TICKETS (AIRPLANE, FOOD, HOTEL, AND SO ON), AND PAY SALARY TO ENGINEER FOR 80 USD/DAY/ENGINEER.

PS: Above Items are discussable according to customer's special requirements.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier