Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine

Product Details
Customization: Available
After-sales Service: Engineer Oversea Service
Warranty: 12 Month
Still deciding? Get samples of US$ 100/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
3000000 RMB
Plant Area
501~1000 square meters
  • Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
  • Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
  • Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
  • Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
  • Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
  • Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Certifications
  • Company Profile
  • Our Advantages
  • After Sales Service
Overview

Basic Info.

Model NO.
SJ75, SJ90, SJ100
Plastic Processed
PE
Product Type
Profile Extrusion Molding Machine
Feeding Mode
Multiple Feed
Assembly Structure
Separate Type Extruder
Screw
Single-Screw
Engagement System
Non-Intermeshing
Screw Channel Structure
Deep Screw
Exhaust
Exhaust
Automation
Automatic
Computerized
Computerized
Motor Brand
Red Flag
Inventer
ABB
Machine Length
26 Meters
Motor Power
37kw, 45kw,55kw
Output
80-160kg/H
Transport Package
Sea Stander Packing
Specification
SJ75, SJ90, SJ100
Trademark
TONGSANHEGU
Origin
China
HS Code
84772090
Production Capacity
80-200kg/H

Packaging & Delivery

Package Size
60.00cm * 60.00cm * 60.00cm
Package Gross Weight
60.000kg
Lead Time
30 days (1 - 1 Pieces)
To be negotiated ( > 1 Pieces)

Product Description

Product Description

Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
  How to recycling waste plastic and turn into valuable and durable profiles?

  Qingdao TONGSANHEGU provide the turnkey project for the automatic system from cutting big waste plastic into small picese, make plastic flakes into granules, extrusion waste plastic into profiles. And we can design and make different size mold according customer requirements

Detailed Photos

1, Waste plastic shredder
Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
2, Waste plastic crusher
Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
3,Waste plastic granulating machine

Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
4,Automatic waste plastic extrusion line
Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine

Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine

 

Certifications

Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine

Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine
Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine

 

Company Profile

Waste Plastic HDPE Post Lumber Decking Continuous Production Making MachineWaste Plastic HDPE Post Lumber Decking Continuous Production Making Machine

Our Advantages

1, We always put machins quality and service in the first position, the machines adopt famous brand motor,inventer,  contactor, temperature controller,vacuum pump,water pump,etc. All machines we provide will be under strict quality inspection and testing well before delivery.

2,Our factory have profession designer team,skillful engineers team,diligent and responsible sellers team,patient after-sales service team.
We have more than 28 years experience for the extrusion machines,we won customer trust and praise by our machine and service.

3,We have sold thousands of devices in more than 70 countries around the world. We continue to improve and innovate, and constantly perfect our equipment in order to provide customers with more energy-efficient, more convenient to operate equipment and more complete solutions.
Waste Plastic HDPE Post Lumber Decking Continuous Production Making Machine

After Sales Service

Before order
1,Customized the production line and auxiliary machine according final products,and show all technical parameter to buyer,provide the turnkey project to customer.
2,Free machine running when customer visit our factory for quality inspection .
3, Design the mold drawing according customer requirements.
4,Design the machine layout and water and electricity layout according buy factory.
5,Any technical parameter support if customer in need.

In production
1,Confirm the mold drawing after received the down payment.
2,Start the product asap and updates the production status every 10 days.
3,Confirm the water and electricity layout and other accessories,ensure plant preparations well before the machines arrives.
4,Determine raw material preparation in customer factory.
5,Within 60 working days after receiving the advance payment, the seller shall notify the buyer to carry out the inspection
6,Arrange machine and mold testing to ensure customer or third party inspection satisfaction.
7,The seller shall complete the packing of the goods within 15 working days after receiving the full payment and be ready to ship.
8,The seller shall inform the buyer of the exact loading time and the buyer shall arrange to supervise the scope of the loading.

Machine in customer factory
1,After determining the date of the machine arrived customer's factory, arrange our professional engineer to install and debug the machine.
2,What the engineer should to do at the customer's plant:
2.1 Quickly install, debug the machine to normal operation and ensure product good quality products.
2,2 Provide the formula for production.
2.3 Teach workers how to use and maintain machines,solutions to daily problems in production
2.4 Any production technical support for customer need.
3,Technical support online   If any problems when production we will reply online asap,within 24 hours to give the solution.
4, Warranty
4.1 Warranty period: 12 months from the first day of operation of the machine in the customer's warehouse  
4.2  The seller shall guarantee that service and spare parts are free of charge throughout the warranty period of the equipment.
4.3Lifetime service: After the 12-month warranty clause, the seller should provide lifelong service for the goods sold and provide the buyer with the payment for the required spare parts.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier