Model |
SJMS51/105 |
SJMS65/132 |
SJMS80/156 |
Max product width |
200mm |
250mm |
600mm |
Extruder capacity |
100-120kg/h |
150-180kg/h |
250-380kg/h |
Main motor power |
22kw |
37kw |
75kg |
Vacuum pump power |
3kw |
7.5*5.5kw |
11*7.5kw |
Calibrating platform length |
4000mm |
6000mm |
6000mm |
wpc door frames extrusion line
The extrusion line includes conical twin screw extruder, calibrating platform, hauling off and cutting machine with dust suction device, stacker.
1. WHY CHOOSE US
Qingdao Tongsan Plastic Machinery is a diversified professional extrusion machine manufacturer. Mainly produce WPC profiles making machine, plastic granulating production line, corrugated plastic pipe making machine and PP hollow sheet making machine. We would like to supply high-class products and satisfy every customer's needs.
2.WHAT SERVICES DO WE OFFER?
2.1 Pre-sale communication
2.2 Design proposal & signature confirmation
2.3 Customized production
2.4 Test machine before shipment
2.5 Package & delivery
2.6 Engineer installation
2.7 Training operator
2.8 Technical support
3.PAYMENT TERMS
30% of total amount should be paid by T/T as down payment.
The balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C by payment (at sight).
4.DELIVERY CONDITIONS
4.1 delivery condition: FOB Qingdao port.
4.2 delivery term: within 60 working days after receipt of down payment, the seller should inform the buyer to do inspection. the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
4.3 supervision of loading: the seller should inform the buyer exacting loading time, the buyer should arrange for supervision of loading!
5.WARRANTY TERMS
5.1 warranty period: 12 months, starting from the first day of running machines in customer's warehouse.
5.2 seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment warranty period.
5.3 lifelong service: the seller should provide lifelong service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.INSPECTION
when the machine finished. the seller should inform the buyer to do inspection before shipment, the seller guaranty good performance of all the sold goods. The seller undertake the material cost for the machine inspection in seller's factory. The buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third part to come to seller's factory to do the inspection work.
7.INSTALLATION
The seller should send engineer to buyer's factory for machine installation and testing. Buyer should undertake all the traveling costs for engineer (such as hotel, air tickets and food) and engineer salary 150 USD/day/engineer. If engineers can't go to customer's factory for machine installation, the seller should provide online video calling service to guide customer for machine installation and running.