Customization: | Available |
---|---|
After-sales Service: | Engineer Oversea Service |
Warranty: | 12 Month |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
M type PE WPC solid decking with online embossing and tick-color production line
The Wood Plastic WPC machine is used for making WPC profiles by Wood and Plastic composition, such as WPC decking, WPC wall cladding, WPC fencing, WPC pergola, WPC post, etc...The production process for making WPC products are mixing--- granulating--- extrusion and molding--- sanding--- embossing or brushing.
Plastic material
|
recyccled PP/PE plastic
|
Wood material
|
wood powder from rice husk/straw,wheat husk/straw,wood sawdust,wastage wood
|
Percentage of plastic
|
25-30%
|
Percentage of wood powder
|
50-70%
|
Final product
|
WPC decking, WPC wall cladding, WPC pergola profile, WPC fence profile, and other WPC construction profiles
|
Production process
|
raw material--mixing--granulation--extrusion and molding--surface treatment
|
Project size
|
Smallest plant
|
Growing plant
|
Most effective plant
|
Ideal plant
|
Project machine FOB cost
|
80000-100000 USD
|
130000-170000 USD
|
250000-340000 USD
|
360000-500000 USD
|
Project capacity
|
1500 kgs per day
(24 hours running)
|
3000 kgs per day
(24 hours running)
|
9000 kgs per day
(24 hours running)
|
18000 kgs per day
(24 hours running)
|
Project factory size
|
300 m2
|
500 m2
|
1000 m2
|
2000 m2
|
3.1 WPC mixing machine
Auxiliary machines for wood powder making
Before order
1,Customized the production line and auxiliary machine according final products,and show all technical parameter to buyer,provide the turnkey project to customer.
2,Free machine running when customer visit our factory for quality inspection .
3, Design the mold drawing according customer requirements.
4,Design the machine layout and water and electricity layout according buy factory.
5,Any technical parameter support if customer in need.
In production
1,Confirm the mold drawing after received the down payment.
2,Start the product asap and updates the production status every 10 days.
3,Confirm the water and electricity layout and other accessories,ensure plant preparations well before the machines arrives.
4,Determine raw material preparation in customer factory.
5,Within 60 working days after receiving the advance payment, the seller shall notify the buyer to carry out the inspection
6,Arrange machine and mold testing to ensure customer or third party inspection satisfaction.
7,The seller shall complete the packing of the goods within 15 working days after receiving the full payment and be ready to ship.
8,The seller shall inform the buyer of the exact loading time and the buyer shall arrange to supervise the scope of the loading.
Machine in customer factory
1,After determining the date of the machine arrived customer's factory, arrange our professional engineer to install and debug the machine.
2,What the engineer should to do at the customer's plant:
2.1 Quickly install, debug the machine to normal operation and ensure product good quality products.
2,2 Provide the formula for production.
2.3 Teach workers how to use and maintain machines,solutions to daily problems in production
2.4 Any production technical support for customer need.
3,Technical support online If any problems when production we will reply online asap,within 24 hours to give the solution.
4, Warranty
4.1 Warranty period: 12 months from the first day of operation of the machine in the customer's warehouse
4.2 The seller shall guarantee that service and spare parts are free of charge throughout the warranty period of the equipment.
4.3Lifetime service: After the 12-month warranty clause, the seller should provide lifelong service for the goods sold and provide the buyer with the payment for the required spare parts.