Extruder Model |
Motor Power |
Pipe Diameter |
Production speed |
Mold pairs |
SJ-65 |
30KW |
12-50mm |
10-20m/min |
50 |
High speed corrugated pipe making machine
This production line can be used to produce corrugated pipes of PP/PE/PVC/EVA/PA continuously.
Plastic single wall corrugated pipes have features of high temperature resistance, corosion and abrasion resistance, high intensity and good flexibility etc.They are widely used in fields of auto wire harness,electric thread-passing pipes, circuit of machine tool,protective of lamps and lantern wires,tubes of air conditioner and washing machine etc.
1. WHY CHOOSE US
Our company could supply turn-key project as feasibility report, workshop planning, technical support , testing, installation, training and after-sale service. We would like to supply high-class products and satisfy every customer's needs. Our equipment to create the greatest value for customers.
2.WHAT SERVICES DO WE OFFER?
2.1 Pre-sale communication
2.2 Design proposal & signature confirmation
2.3 Customized production
2.4 Test machine before shipment
2.5 Package & delivery
2.6 Engineer installation
2.7 Training operator
2.8 Technical support
3.PAYMENT TERMS
30% of total price to be paid by T/T as down payment.
The balance (70% of total price) to be paid before delivery by T/T or irrevocable L/C by payment (at sight).
4.DELIVERY CONDITIONS
4.1 delivery condition: FOB Qingdao port.
4.2 delivery term: within 60 working days after receipt of down payment, the seller should inform the buyer to do inspection. the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full payment.
4.3 supervision of loading: the seller should inform the buyer exacting loading time, the buyer should arrange for supervision of loading!
5.WARRANTY TERMS
5.1 warranty period: 12 months, starting from the first day of running machines in customer's warehouse.
5.2 seller shall grant: services and spare parts, free-of-charge service throughout the entire equipment warranty period.
5.3 lifelong service: the seller should provide lifelong service for the sold goods, the buyer pay for needed spare parts after the 12months warranty terms.
6.INSPECTION
when the machine finished. the seller should inform the buyer to do inspection before shipment. The buyer should come to seller's factory to do the inspection work, or the buyer could entrust any third part to come to seller's factory to do the inspection work.
7.INSTALLATION
The seller should send engineer to buyer's factory for machine installation and testing. Buyer should undertake all the costs for engineer (such as hotel, air tickets and fee of applying visa) and engineer salary 150 USD/day/engineer. If engineers can't go to customer's factory for machine installation, the seller should provide online video calling service to guide customer for machine installation and running.