Customization: | Available |
---|---|
After-sales Service: | Engineer Oversea Service |
Warranty: | 12 Month |
Still deciding? Get samples of US$ 1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Plastic material
|
recycled PP/PE plastic
|
Wood material
|
wood powder from rice husk/straw,wheat husk/straw,wood sawdust,wastage wood
|
Percentage of plastic
|
25-30%
|
Percentage of wood powder
|
50-70%
|
Final product
|
WPC decking, WPC wall cladding, WPC pergola profile,WPC post, WPC fence profile, and other WPC construction profiles
|
Production process
|
raw material--mixing--granulation--extrusion and molding--surface treatment
|
Model | L/D ratio | Max.capacity | Motor power | Suitable material | Max.rotating speed | Wood powder percentage |
SHMS-65 | 40:1 | 200-220kg/h | 75kw | Pe+wood powder | 500r/min | ≤75% |
SHMS-75 | 40:1 | 300-350kg/h | 90kw | Pe+wood powder | 500r/min | ≤75% |
SHMS-90 | 40:1 | 500-600kg/h | 132kw | Pe+wood powder | 500r/min | ≤75% |
Model | HGMSE-65 | HGMSE-80 |
Extruder model | SJMS65/132 | SJMS 80/156 |
Motor power | 37kw | 75kw |
Mac.Extrusion capacity | 140-160kg/h | 220-250kg/h |
Co-extruder(Optional) | SJ35/28 | SJ45/28 |
1. Why choose us
We are the first manufacturer in Qingdao to develop plastic extruders. We have 22 years of experience in mechanical manufacturing. What we pursue is machine quality and customer satisfaction.
We only choose qualified supplier -- Tongsan excellent partner
We work closely with world famous brand,your equipment can also be equipped with any famous brand as you wish,such as Siemens motor,ABB inventer,Omron temperature controller, Schneider electric devices,etc.
2. What service do we provide?
Perfect service system:
1.We will provide the Feasibility Analysis Report for your project.
2.We will provide the model selection and technical parameter of our machinery.
3.We will provide the design for the plant and electric power accounting for the facilities.
4.We will provide the design for plastic formula according to the products requirement.
5.We will provide the technology of plastic product surface treatment if need.
6.We will provide technique training for your operator.
7.We will provide solution for the production problem .
8.We will install and test the machine in customer's factory.
9.We will provide turnkey project to customers.
3. Payment terms
30% of the total amount should be paid by wire transfer as a down payment, and the balance (70% of the total amount) should be paid (at sight) before the delivery of the wire transfer or irrevocable letter of credit
4. Delivery terms:
4.1 Delivery terms: FOB Qingdao Port.
4.2 Delivery deadline: within 30-60 working days after receiving the advance payment, the seller shall notify the buyer to inspect. The seller should complete the packaging of the goods within 15 working days after receiving the full payment and be ready for shipment.
4.3 Supervised loading: The seller should inform the buyer of the exact loading time, and the buyer should arrange the scope of supervised loading.
5. Warranty terms:
5.1 Warranty period: 12 months from the first day of operation of the machine in the customer's warehouse
5.2 The seller shall guarantee that the service and spare parts are free of charge during the entire equipment warranty period.
5.3 LIFELONG service: After the 12-month warranty, the seller shall provide LIFELONG service for the sold goods, and the buyer shall pay for the required spare parts.
6. Inspection :
After the machine is completed, the seller should notify the buyer to inspect before delivery, and the seller guarantees that all the goods sold are of good quality. The seller does not bear the material cost of the machine inspection in the seller's factory. The buyer should come to the seller's factory for inspection, or the buyer can invite any third party to enter the seller's factory for inspection.
7. Installation and equipment debugging:
If the buyer needs it, the seller should send a team of technicians to the buyer's factory for full-line operation of installation and testing, and the buyer should lift the price of the entire food/location and group purchase information (aircraft, food, hotel, etc.), and charge the engineer 100 USD/day/engineer's cost.