Plastic Water Supply and Water Drainage PVC Pipe Production Machine

Product Details
Customization: Available
Product Type: PVC Pipe
Screw No.: Double-screw
Still deciding? Get samples of US$ 1/Piece
Request Sample
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
3000000 RMB
Plant Area
501~1000 square meters
  • Plastic Water Supply and Water Drainage PVC Pipe Production Machine
  • Plastic Water Supply and Water Drainage PVC Pipe Production Machine
  • Plastic Water Supply and Water Drainage PVC Pipe Production Machine
  • Plastic Water Supply and Water Drainage PVC Pipe Production Machine
  • Plastic Water Supply and Water Drainage PVC Pipe Production Machine
  • Plastic Water Supply and Water Drainage PVC Pipe Production Machine
Find Similar Products

Basic Info.

Model NO.
SJSZ80/156
Computerized
Computerized
Certification
CE
Customized
Customized
Condition
New
Machine Color
Customized
Extruder Size
65/132
Extruder Motor
37kw Siemens Motor
Temperature Control
Auto Control, Omron Brand
Inverter
ABB Brand
Transport Package
Film Packing
Specification
50-200mm
Trademark
Tongsan
Origin
China
HS Code
84772090

Product Description

UPVC CPVC Water Supply and Water Drain Plastic PVC Pipe Extrusion Machine,
 CPVC UPVC Plastic PVC pipe manufacturing machine
Plastic Water supply and Water drainage PVC pipe production machine


 Technical data sheet for PVC pipe machine

Model

Pipe diameter

Extruder model

Motor power

Extrusion capacity

Pipe Cavity
SJPVCG-63 16-40mm 51/105 22kw 100-110kg/h 2
SJPVCG-110 50-110mm 65/132 37kw 150-180kg/h 1
SJPVCG-160 75-160mm 65/132 37kw 150-180kg/h 1
SJPVCG-250 160-250mm 80/156 75kw 300-350kg/h 1
SJPVCG-400 200-400mm 80/156 75kw 300-350kg/h 1


Advantage of PVC pipe machine
  1. This PVC Pipe Production Line is consists by conical twin screw extruder-mould-vacuum calibrating tank-water spraying tank-haul off-cutter-stacker
  2. Extruder and Haul Off Machine adopt AC frequency speed regulator.
  3. Mould is processed from SC 45# forged material. Mould inner wall is chromed, surface is smooth.
  4. Haul Off machine could use 2 caterpillar, 4 caterpillar etc according to the pipe diameter and wall thickness
  5. Cutter could use saw cutting and planetary cutting, equipped with meter counter.
  6.  The machine has reliable performance and high production efficiency.
  7. By changing extra mould or extruder, this machine could also produce spiral wall pipe, hollow wall pipe, and foam core layer pipe.
Pictures for PVC pipe machine



Plastic Water Supply and Water Drainage PVC Pipe Production Machine






Plastic Water Supply and Water Drainage PVC Pipe Production Machine

 

Plastic Water Supply and Water Drainage PVC Pipe Production Machine


Plastic Water Supply and Water Drainage PVC Pipe Production Machine
Plastic Water Supply and Water Drainage PVC Pipe Production Machine
Plastic Water Supply and Water Drainage PVC Pipe Production Machine
Plastic Water Supply and Water Drainage PVC Pipe Production Machine

FAQ
1, DO YOU PROVIDE OEM SERVICE?
we accept OEM order to design the machine according to customer's special requirements.

2, HOW CAN I GET THE TECHNICAL PARAMETERS?
Please contact us for sending you detailed quotation with technical parameters

3, WHAT IS THE  WARRANTY TERMS?
3.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER'S WAREHOUSE
3.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
3.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.

4, WHAT IS THE DELIVERY CONDITIONS?
4.1 DELIVERY CONDITION: FOB QINGDAO PORT.
4.2 DELIVERY TERM: WITHIN 45 WORKING DAYS AFTER RECEIPT OF  ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
4.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER SHOULD ARRANGE FOR SUPERVISION OF LOADING.

5, WHAT IS THE PAYMENT TERMS?
5.1 INSTALLMENT I: 30% OF TOTAL PAYMENT TO BE PAID AT ADVANCE
5.2 INSTALLMENT II: THE BALANCE 70% OF TOTAL PAYMENT TO BE PAID BY TT OR LC AT SIGHT

6, HOW TO DO THE INSPECTION WORK BEFORE SHIPMENT?
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST  FOR THE MACHINE INSPECTION IN SELLER'S FACTORY. THE BUYER SHOULD COME TO SELLER'S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER'S FACTORY TO DO THE INSPECTION WORK.

7, HOW TO DO THE INSTALLATION AND EQUIPMENT COMMISSIONING?
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER'S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE, AND THE BUYER SHOULD UNDERTAKE THE WHOLE FOOD/PLACE AND ROUND TICKETS (AIRPLANE, FOOD, HOTEL, AND SO ON), AND PAY SALARY TO ENGINEER FOR 80 USD/DAY/ENGINEER.

PS: Above Items are discussable according to customer's special requirements.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier