16-315mm Plastic extrusion PVC pipe making machine price
1, PVC pipe making machine for manufacturing PVC water tube
we have different models of PVC pipe making machine for making different PVC pipe diameter, below is our PVC pipe plant cost for your reference:
Model |
Diameter |
Approximately price |
Production capacity |
Main extruder power |
51/105 |
16-50mm |
30000-35000 USD |
80-120kg/h |
22kw |
65/132 |
50-160mm |
40000-46000 USD |
150-240kg/h |
37kw |
80/156 |
160-315mm |
65000-72000 USD |
300-350kg/h |
75kw |
92/188 |
315-500mm |
190000-200000 USD |
400-500kg/h |
110kw |
2, Product Description
The production line adopts unique mold and sizing sleeve design, which can produce PVC solid pipe continuously and stably. PVC pipe has the features of strong corrosion resistance, easy adhesion, low price and hard texture. However, due to PVC-U monomer and additive bleed, it is only suitable for supplying water that the temperature not exceeding 45 ºC. PVC pipe is widely used in water drainage, sewage water, chemicals, heating fluids and coolants, food, ultra-pure liquids, mud, gas, compressed air and vacuun m systems.
3, Equipment List
No. |
Equipment list for PVC pipe manufacturing plant |
Quantity |
1 |
Mixing machine |
1 set |
2 |
Auto feeder |
2 sets |
3 |
Conical double screw extruder |
1 set |
4 |
Die head and sizing mold |
customized |
5 |
1st cooling tank |
1 set |
6 |
2nd cooling tank |
1 set |
7 |
haul off device |
1 set |
8 |
auto cutting machine |
1 set |
9 |
Laser printer or ink jet printer |
1 set |
10 |
PVC pipe stacker |
1 set |
11 |
PVC pipe joint belling machine |
1 set |
12 |
Crushing machine |
1 set |
13 |
PVC powder milling machine |
1 set |
14 |
Air compressor |
1 set |
15 |
water chiller |
1 set |
4, Detailed Images
Extruder for PVC pipe machine: conical double screw extruder
with auto screw feeder
high quality gearbox
37KW siemens motor,equip with ABB inverter
Auto Omron Temperature control
die head
equip size parts for 50,63,75,90,110,125,140,160,180,200mm diameter
water tank for PVC pipe machine
Quantity: two sets
length of tank: 6 meters/tank
cooling type: vacuum cooling and water cooling
haul off for PVC pipe machine
Quantity of caterpillar: 2-4 sets of rubber caterpillar
speed control: by ABB inverter control
Auto cutter for PVC pipe machine
equip with dust collection system
cutter type: simple saw cutting, or Planetary cutting .
Product stacker
auto stacking, 6 meter length
Online laser printing machine
FAQ
1, DO YOU PROVIDE OEM SERVICE?
we accept OEM order to design the machine according to customer's special requirements.
2, HOW CAN I GET THE TECHNICAL PARAMETERS?
Please contact us for sending you detailed quotation with technical parameters
3, WHAT IS THE WARRANTY TERMS?
3.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER'S WAREHOUSE
3.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
3.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.
4, WHAT IS THE DELIVERY CONDITIONS?
4.1 DELIVERY CONDITION: FOB QINGDAO PORT.
4.2 DELIVERY TERM: WITHIN 45 WORKING DAYS AFTER RECEIPT OF ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
4.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER SHOULD ARRANGE FOR SUPERVISION OF LOADING.
5, WHAT IS THE PAYMENT TERMS?
5.1 INSTALLMENT I: 30% OF TOTAL PAYMENT TO BE PAID AT ADVANCE
5.2 INSTALLMENT II: THE BALANCE 70% OF TOTAL PAYMENT TO BE PAID BY TT OR LC AT SIGHT
6, HOW TO DO THE INSPECTION WORK BEFORE SHIPMENT?
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST FOR THE MACHINE INSPECTION IN SELLER'S FACTORY. THE BUYER SHOULD COME TO SELLER'S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER'S FACTORY TO DO THE INSPECTION WORK.
7, HOW TO DO THE INSTALLATION AND EQUIPMENT COMMISSIONING?
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER'S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE, AND THE BUYER SHOULD UNDERTAKE THE WHOLE FOOD/PLACE AND ROUND TICKETS (AIRPLANE, FOOD, HOTEL, AND SO ON), AND PAY SALARY TO ENGINEER FOR 80 USD/DAY/ENGINEER.
PS: Above Items are discussable according to customer's special requirements.