Washing Basin Corrugated Drain Hose Making Machine

Product Details
Customization: Available
Product Type: PE Pipe
Screw No.: Single-screw
Still deciding? Get samples of US$ 1/Piece
Request Sample
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
3000000 RMB
Plant Area
501~1000 square meters
  • Washing Basin Corrugated Drain Hose Making Machine
  • Washing Basin Corrugated Drain Hose Making Machine
  • Washing Basin Corrugated Drain Hose Making Machine
  • Washing Basin Corrugated Drain Hose Making Machine
  • Washing Basin Corrugated Drain Hose Making Machine
  • Washing Basin Corrugated Drain Hose Making Machine
Find Similar Products

Basic Info.

Model NO.
SJ65
Automation
Automatic
Computerized
Computerized
Certification
CE
Customized
Customized
Condition
New
Machine Color
Customized
Extruder Size
Sj45,Sj50,Sj65
Transport Package
Film Wrapping, Wooden Case, Strong Pallet
Specification
4.5-110mm
Trademark
Tongsan
Origin
China
HS Code
84772090
Production Capacity
30 Sets/Month

Product Description

Washing basin drain hose making machine
Washing Basin Corrugated Drain Hose Making Machine
Tongsan is professional in corrugated pipe making machine, we have many machines in factory stock.
Washing Basin Corrugated Drain Hose Making Machine
Model of Plastic corrugated pipe machine
Model SJ45 SJ50 SJ65 SJ65 high speed
Diameter 5-14mm 9-32mm 16-50mm 9-50mm
Quantity of mold blocks 42 pairs 50 pairs 50 pairs 72 pairs
Production speed 4-10m/min 4-10m/min 16-50m/min 20-30m/min

high speed corrugated pipe machine
Washing Basin Corrugated Drain Hose Making Machine

High quality single screw extruder: high effective extruder,

with auto feeding device and drying hopper
Washing Basin Corrugated Drain Hose Making Machine

high speed forming machine for corrrugated pipe machine

20-30meter/minute speed.

with water cooling

Washing Basin Corrugated Drain Hose Making Machine

high speed mold for corrugated pipe machine

material: 40 cr with nitrating

mold quantity: 72 pairs

cavity: double size on same mold

speed: 20-30meter/minute
Washing Basin Corrugated Drain Hose Making Machine
auto winder for corrugated pipe machine

Washing Basin Corrugated Drain Hose Making Machine
Normal speed corrugated pipe machine
Washing Basin Corrugated Drain Hose Making Machine

4-10m/min Forming machine and mold
Washing Basin Corrugated Drain Hose Making Machine
Normal speed mold: 

Washing Basin Corrugated Drain Hose Making Machine

Auto winding machine


Washing Basin Corrugated Drain Hose Making Machine

Vacuum cooling corrugated pipe machine for special joint pipe making

Washing Basin Corrugated Drain Hose Making Machine

FAQ
1, DO YOU PROVIDE OEM SERVICE?

we accept OEM order to design the machine according to customer's special requirements.

2, HOW CAN I GET THE TECHNICAL PARAMETERS?
Please contact us for sending you detailed quotation with technical parameters

3, WHAT IS THE  WARRANTY TERMS?
3.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER'S WAREHOUSE
3.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
3.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.

4, WHAT IS THE DELIVERY CONDITIONS?
4.1 DELIVERY CONDITION: FOB QINGDAO PORT.
4.2 DELIVERY TERM: WITHIN 45 WORKING DAYS AFTER RECEIPT OF  ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
4.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER SHOULD ARRANGE FOR SUPERVISION OF LOADING.

5, WHAT IS THE PAYMENT TERMS?
5.1 INSTALLMENT I: 30% OF TOTAL PAYMENT TO BE PAID AT ADVANCE
5.2 INSTALLMENT II: THE BALANCE 70% OF TOTAL PAYMENT TO BE PAID BY TT OR LC AT SIGHT

6, HOW TO DO THE INSPECTION WORK BEFORE SHIPMENT?
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST  FOR THE MACHINE INSPECTION IN SELLER'S FACTORY. THE BUYER SHOULD COME TO SELLER'S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER'S FACTORY TO DO THE INSPECTION WORK.

7, HOW TO DO THE INSTALLATION AND EQUIPMENT COMMISSIONING?
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER'S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE, AND THE BUYER SHOULD UNDERTAKE THE WHOLE FOOD/PLACE AND ROUND TICKETS (AIRPLANE, FOOD, HOTEL, AND SO ON), AND PAY SALARY TO ENGINEER FOR 80 USD/DAY/ENGINEER.

PS: Above Items are discussable according to customer's special requirements.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier