MID East Hot Design WPC Assemble Door Making Machine Turnkey Prject

Product Details
Customization: Available
After-sales Service: Engineer Oversea Service
Warranty: 12 Month
Still deciding? Get samples of US$ 100/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
3000000 RMB
Plant Area
501~1000 square meters
  • MID East Hot Design WPC Assemble Door Making Machine Turnkey Prject
  • MID East Hot Design WPC Assemble Door Making Machine Turnkey Prject
  • MID East Hot Design WPC Assemble Door Making Machine Turnkey Prject
  • MID East Hot Design WPC Assemble Door Making Machine Turnkey Prject
  • MID East Hot Design WPC Assemble Door Making Machine Turnkey Prject
  • MID East Hot Design WPC Assemble Door Making Machine Turnkey Prject
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Certifications
  • Company Profile
  • Our Advantages
  • After Sales Service
Overview

Basic Info.

Model NO.
SJMS65/132
Type
Pipe Extruder
Plastic Processed
PVC
Product Type
Extrusion Molding Machine
Feeding Mode
Multiple Feed
Assembly Structure
Separate Type Extruder
Screw
Twin-Screw
Engagement System
Full Intermeshing
Screw Channel Structure
Deep Screw
Exhaust
Exhaust
Automation
Automatic
Computerized
Computerized
Machines Layout
20m*40m*5m
Total Instal Power
85kw
Output
120-160kg/H
Advantage
Low Investment,Easy Operation
Transport Package
Sea Stander Package
Specification
SJMS65/132
Trademark
TONGSANHEGU
Origin
China
HS Code
84772090
Production Capacity
20-50sets/Year

Packaging & Delivery

Package Size
60.00cm * 60.00cm * 60.00cm
Package Gross Weight
60.000kg
Lead Time
30 days (1 - 1 Pieces)
To be negotiated ( > 1 Pieces)

Product Description

 
Product Description

The WPC assemble door is Mid East Hot Design, the WPC asssemble door making machne project is lower inestment and easyoperation.
Qingdao Tongsanhegu professional for the Whole WPC production line with turnkey Project Service since 1998, we have rich experience for the wood plastic composite door making machine.
If you want to make the whole set WPC assemble door in your factory, we will provide the good quality machines and technical support .

One line for WPC assemble doors making!
3-4 sets doors per hour!!!
70-90 sets doors per day (24 hours)!!!
5-10 workers for all project !!!
Low investment and easy operation!!!
Contact me for new project !!!
MID East Hot Design WPC Assemble Door Making Machine Turnkey Prject
MID East Hot Design WPC Assemble Door Making Machine Turnkey Prject
 We have different type of WPC machines to make different WPC products from different raw material,such as:
1, PP PE WPC profile machine:
Material: recycled 30% PP/HDPE+70% wood powder+chemical additives.
Product: WPC decking, WPC wall cladding, WPC fence, WPC pergola.WPC louver.
2, PVC WPC profile machine:
Material: 50%PVC+20% wood+20% caco3+ Chemical additives.
Product: WPC door frame, WPC wall panel, WPC decoration profiles indoor.
3, PVC WPC door machine:
Material:50% PVC+20% wood+20% caco3 +Chemical additives.
Product: Hollow Door pane l, Cabinet Door, and other big profiles
4, PVC WPC board machine:
Material: 60% PVC+10% wood +20% CaCo3+ Chemical additives.
Product: Solid door panel, Furniture board, partition wall panel, decoration solid panel.
5,UPVC window profiles and panel making machines
Material: 40% PVC+50% CaCo3+ Chemical additives.
Products:UPVC windows and doors,PVC ceiling,PVC wall panel,PVC rain gutter,PVC profiles.

Detailed Photos

MID East Hot Design WPC Assemble Door Making Machine Turnkey Prject
MID East Hot Design WPC Assemble Door Making Machine Turnkey Prject

Product Parameters
No. DESCRIPTION OF GOODS
1 High speed hot and cold SHRL300/600 Mixer (62.5kw, 300-400kg/h)
HS code:8479820090
2 WPC door profiles extrusion line HGMS65/132 (85kw,150-200kg/h)
HS:84772090
3 Door frame ,cover and panel mold  HS :8480790090
4 Precision cutting machine HGMS-2000 HS:8477800000
5 Film slitting machine
HS:84779000
6 PUR hot glue laminating machine HG-300 HS:84779000
7 Wood milling machine JFS-60-50 (95kw,150-2300kg/h )
HS:84779000
8  Anges Water chiller
HS:84779000
9 screw type air compressor
HS:84779000
10 SHR360 Crusher(15kw,200-300kg/h)
HS:84779000
11 PVC WPC milling machine (37kw,200-300kg/h)
HS:
84779000
MID East Hot Design WPC Assemble Door Making Machine Turnkey Prject
Certifications

MID East Hot Design WPC Assemble Door Making Machine Turnkey Prject

Company Profile

MID East Hot Design WPC Assemble Door Making Machine Turnkey Prject

Our Advantages

1, We always put machins quality and service in the first position, the machines adopt famous brand motor,inventer,  contactor, temperature controller,vacuum pump,water pump,etc. All machines we provide will be under strict quality inspection and testing well before delivery.

2,Our factory have profession designer team,skillful engineers team,diligent and responsible sellers team,patient after-sales service team.
We have more than 28 years experience for the extrusion machines,we won customer trust and praise by our machine and service.

3,We have sold thousands of devices in more than 70 countries around the world. We continue to improve and innovate, and constantly perfect our equipment in order to provide customers with more energy-efficient, more convenient to operate equipment and more complete solutions.
MID East Hot Design WPC Assemble Door Making Machine Turnkey Prject

After Sales Service

Before order
1,Customized the production line and auxiliary machine according final products,and show all technical parameter to buyer,provide the turnkey project to customer.
2,Free machine running when customer visit our factory for quality inspection .
3, Design the mold drawing according customer requirements.
4,Design the machine layout and water and electricity layout according buy factory.
5,Any technical parameter support if customer in need.

In production
1,Confirm the mold drawing after received the down payment.
2,Start the product asap and updates the production status every 10 days.
3,Confirm the water and electricity layout and other accessories,ensure plant preparations well before the machines arrives.
4,Determine raw material preparation in customer factory.
5,Within 60 working days after receiving the advance payment, the seller shall notify the buyer to carry out the inspection
6,Arrange machine and mold testing to ensure customer or third party inspection satisfaction.
7,The seller shall complete the packing of the goods within 15 working days after receiving the full payment and be ready to ship.
8,The seller shall inform the buyer of the exact loading time and the buyer shall arrange to supervise the scope of the loading.

Machine in customer factory
1,After determining the date of the machine arrived customer's factory, arrange our professional engineer to install and debug the machine.
2,What the engineer should to do at the customer's plant:
2.1 Quickly install, debug the machine to normal operation and ensure product good quality products.
2,2 Provide the formula for production.
2.3 Teach workers how to use and maintain machines,solutions to daily problems in production
2.4 Any production technical support for customer need.
3,Technical support online   If any problems when production we will reply online asap,within 24 hours to give the solution.
4, Warranty
4.1 Warranty period: 12 months from the first day of operation of the machine in the customer's warehouse  
4.2  The seller shall guarantee that service and spare parts are free of charge throughout the warranty period of the equipment.
4.3Lifetime service: After the 12-month warranty clause, the seller should provide lifelong service for the goods sold and provide the buyer with the payment for the required spare parts.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier