• CPVC/UPVC/PVC Pipe Making Line /PVC CPVC UPVC Material Conduit Gas Water Supply and Drainage Pipe Extrusion Production Line
  • CPVC/UPVC/PVC Pipe Making Line /PVC CPVC UPVC Material Conduit Gas Water Supply and Drainage Pipe Extrusion Production Line
  • CPVC/UPVC/PVC Pipe Making Line /PVC CPVC UPVC Material Conduit Gas Water Supply and Drainage Pipe Extrusion Production Line
  • CPVC/UPVC/PVC Pipe Making Line /PVC CPVC UPVC Material Conduit Gas Water Supply and Drainage Pipe Extrusion Production Line
  • CPVC/UPVC/PVC Pipe Making Line /PVC CPVC UPVC Material Conduit Gas Water Supply and Drainage Pipe Extrusion Production Line
  • CPVC/UPVC/PVC Pipe Making Line /PVC CPVC UPVC Material Conduit Gas Water Supply and Drainage Pipe Extrusion Production Line

CPVC/UPVC/PVC Pipe Making Line /PVC CPVC UPVC Material Conduit Gas Water Supply and Drainage Pipe Extrusion Production Line

Warranty: 1year
Product Type: PVC Pipe
Screw No.: Double-screw
Automation: Automatic
Computerized: Computerized
Certification: CE, ISO9001:2008
Customization:
Diamond Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
SJMS-51/105
Customized
Customized
Condition
New
After-sales Service
1year
Brand
Qingdao Tongsan
Proudct
PVC Pipe Machinery
Suitable Material
PVC/CPVC UPVC
Cooling Way
Water Cooling
After Sale
Engineers Available Toservice Machine
Transport Package
Wood Block Fixed Steel Wire Reinforcement
Specification
SJMS-51/105
Trademark
QINGDAO TONGSAN
Origin
Qingdao China
HS Code
84772090
Production Capacity
24/Year

Product Description

 
       About PVC Pipe Making Machine
       The production line adopts unique mold and sizing sleeve design, which can produce PVC solid pipe continuously and stably. PVC pipe has the features of strong corrosion resistance, easy adhesion, low price and hard texture. However, due to PVC-U monomer and additive bleed, it is only suitable for supplying water that the temperature not exceeding 45 ºC. PVC pipe is widely used in water drainage, sewage water, chemicals, heating fluids and coolants, food, ultra-pure liquids, mud, gas, compressed air and vacuun m systems.
CPVC/UPVC/PVC Pipe Making Line /PVC CPVC UPVC Material Conduit Gas Water Supply and Drainage Pipe Extrusion Production LineCPVC/UPVC/PVC Pipe Making Line /PVC CPVC UPVC Material Conduit Gas Water Supply and Drainage Pipe Extrusion Production LineCPVC/UPVC/PVC Pipe Making Line /PVC CPVC UPVC Material Conduit Gas Water Supply and Drainage Pipe Extrusion Production LineCPVC/UPVC/PVC Pipe Making Line /PVC CPVC UPVC Material Conduit Gas Water Supply and Drainage Pipe Extrusion Production LineCPVC/UPVC/PVC Pipe Making Line /PVC CPVC UPVC Material Conduit Gas Water Supply and Drainage Pipe Extrusion Production Line
      we have different models of PVC pipe making machine for making different PVC pipe diameter, below is our PVC pipe plant cost for your reference:
Model Diameter Approximately price Production capacity Main extruder power
51/105 16-50mm 30000-35000 USD 80-120kg/h 22kw
65/132 50-160mm 40000-46000 USD 150-240kg/h 37kw
80/156 160-315mm 65000-72000 USD 300-350kg/h 75kw
92/188 315-500mm 190000-200000 USD 400-500kg/h 110kw
      FAQ
1, DO YOU PROVIDE OEM SERVICE?
we accept OEM order to design the machine according to customer's special requirements.

2, HOW CAN I GET THE TECHNICAL PARAMETERS?
Please contact us for sending you detailed quotation with technical parameters

3, WHAT IS THE  WARRANTY TERMS?
3.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER'S WAREHOUSE
3.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
3.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.

4, WHAT IS THE DELIVERY CONDITIONS?
4.1 DELIVERY CONDITION: FOB QINGDAO PORT.
4.2 DELIVERY TERM: WITHIN 45 WORKING DAYS AFTER RECEIPT OF  ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
4.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER SHOULD ARRANGE FOR SUPERVISION OF LOADING.

5, WHAT IS THE PAYMENT TERMS?
5.1 INSTALLMENT I: 30% OF TOTAL PAYMENT TO BE PAID AT ADVANCE
5.2 INSTALLMENT II: THE BALANCE 70% OF TOTAL PAYMENT TO BE PAID BY TT OR LC AT SIGHT

6, HOW TO DO THE INSPECTION WORK BEFORE SHIPMENT?
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST  FOR THE MACHINE INSPECTION IN SELLER'S FACTORY. THE BUYER SHOULD COME TO SELLER'S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER'S FACTORY TO DO THE INSPECTION WORK.

7, HOW TO DO THE INSTALLATION AND EQUIPMENT COMMISSIONING?
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER'S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE, AND THE BUYER SHOULD UNDERTAKE THE WHOLE FOOD/PLACE AND ROUND TICKETS (AIRPLANE, FOOD, HOTEL, AND SO ON), AND PAY SALARY TO ENGINEER FOR 80 USD/DAY/ENGINEER.

PS: Above Items are discussable according to customer's special requirements.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now